DPDP Rules 2025 notified — enforceable 13 May 2027.|Time left: –d –h –m –s
What it covers

Designed before a line of code, built to hold up after launch

Flows, data mapping, integration points, and the governance layer that keeps the architecture from drifting once it's live.

Consent flow design

How consent is captured, recorded and updated across every channel a user actually interacts through.

Purpose-linked data mapping

Which data elements tie to which stated purpose, so consent state can actually be enforced downstream, not just recorded.

Legal-basis tagging

Where consent is the legal basis for processing versus another ground under the Act, and how the architecture reflects that distinction.

System integration points

Where the consent layer needs to talk to existing systems — CRM, marketing stack, backend services — and how.

Withdrawal & update handling

How a change in consent actually propagates through connected systems, not just a single record.

Internal governance layer

The plan for actually enforcing consent day to day: who owns monitoring it, what internal checks confirm the architecture is being followed in practice, and what's needed operationally for the design to hold up after launch, not just at handoff.

What you get

A build-ready specification, not just a diagram

Everything a development team needs — in-house or ours — to build against, plus the governance plan that keeps it enforced going forward.

  • A consent architecture blueprint covering flows, data mapping and integration points
  • A purpose-and-legal-basis map tying data elements to what actually justifies processing them
  • An integration specification ready to hand to a development team, in-house or ours
  • A withdrawal/update propagation design showing how a consent change reaches every connected system
  • An internal governance plan naming who owns enforcement and how it gets checked, so the architecture doesn't quietly drift once it's live
Process

Five stages, click any to see more

From data mapping to a build-ready handoff, with a governance plan and technical validation before anyone starts building.

01

Discovery & data mapping

Map current data flows and where consent decisions need to apply.

The starting map every later design decision gets checked against — flows, storage points, and where consent actually needs to sit.

02

Architecture design

Design the flows, purpose linkage, and integration points.

Consent capture, purpose-linked data mapping, and legal-basis tagging, drawn as a single architecture rather than three separate documents.

03

Governance planning

Define who owns enforcement internally and how it gets monitored once the architecture is live.

Named ownership and real internal checks — the layer that keeps the design from drifting once it's handed off.

04

Review & validation

Walk the design through with your technical team before build begins.

A chance to catch integration issues on paper, before they turn into rework once development starts.

05

Handoff documentation

Deliver a build-ready specification, whether development happens with us or elsewhere.

Vendor-neutral by design — usable by any development team, in-house or ours.

Ready to design the consent architecture before anyone writes a line of code?

Start with a scoping call — 30 minutes, no obligation.

Book a Consultation